Issues 85-92

The construction continue towards fixing of the internal compartments and attachment of completed mandibles. Then I performed lighning test. I will utilize some of the oob lights – for sure engines, landing lights and other need some improvement ๐Ÿ™‚ Engine for instance is way too dimmed…. and the general appearance is not according to my…

Details

80 – 84 done, 15 TO GO!

Construction continues around mandibles. Left mandible frame maintenance bays and external details. Bottom and top mandible sides. I must say that even out of the kit it looks ok. Side frame construction started. Thats all for today short session. I’m starting the last manuals folder ๐Ÿ™‚ – only 15 issues in front of me –…

Details

Issues 74-79 – right mandible

Falcon construction continues to another iconic parts of the space-ship – front mandibles!The inner frame build went straight forward – I didn’t took any picture of it – trust me – it was straight forward ๐Ÿ™‚ Maintenance bays were fitted into dedicated slots – there are some extra details placed here and there in round…

Details

Millennium Falcon issues 68-73

Construction continues around engines cover – it is still separated from the model, will be fixed later. Then, following the instruction I focused on the front section of the top saucer. Those pieces will be removable in the finished model as it will cover internal compartments builded before. Main parts combined together and magnets are…

Details

Steps 58-67 completed

If you’re Millennium Falcon fan then you know how StarWars movie models were created. Many detail parts on a surface comes from various plastic model kit sets like tanks, cars etc. During the build I can recognized those – DeAgostini did a great job to add those “greeblies” (how it was called by ILM team)…

Details

DeAgostini Falcon – The Ramp

Finally, I was able to test out Millennium Falcon motorized boarding ramp. Surprisingly it went fine without any adjustments!I was playing for like half an hour like a child ๐Ÿ™‚ COOL!!! Of course I will paint it, weather etc later on. Today Arduino set arrived with prototyping board + RGB LEDs and Fiber Optics (1,0…

Details

Stages 47-57 completed

I sit for a moment to the model just to have a look on it…. and somehow 4h passed in a snap ๐Ÿ™‚I like how the construction is planned and how it is mixed with variety of areas from details and frame construction and some electrical components – I’m superimpressed with DeAgostini kit! Greeblies!!! Many…

Details

Deago Falcon Stages 30-40

Again, DeAgostini did good job with mixing the construction between frame assembly, some exterior details and building motorized loading ramp. The ramp assembly is quite complex including hinge mechanism and scale details. Additional LEDs are already mounted on a frame. Ramp assembly completed as separate part of bottom frame. Bottom frame completed! Bottom saucer looks…

Details

Stages 19-29

Issues from 19 to 29 completed. The construction went smooth basically focused on internal compartment and corridors. It looks like Millennium Falcon! No plans for detailing interiors, but who knows, maybe one day I will focus on that. Out of the box (boxes) parts looks like a perfect base for customization and it resemble movie…

Details