Cooling fans in place
I was planning this design in my head for a while… Finally the time has come to put my thoughts…
I was planning this design in my head for a while… Finally the time has come to put my thoughts…
Quick update this time – all koolshades are completed. As my friend told me – if I will go one…
Some years ago, I bought photoetched vents set from https://scifimodels.de/ – to be honest, when I received it – I…
Some new additional parts arrived last week. A bag of electonics bought on Aliexpress. …and set of resin prints from…
Issues 96-97 focuses on engine cover details. Many small “greeblies”, some are easily recognizable as some tank parts, suspension and…
Short update, some 2h session, 3 bags with parts added to the model.Docking bays completed. Construction was focused on side…
The construction continue towards fixing of the internal compartments and attachment of completed mandibles. Then I performed lighning test. I…
Construction continues around mandibles. Left mandible frame maintenance bays and external details. Bottom and top mandible sides. I must say…
Falcon construction continues to another iconic parts of the space-ship – front mandibles!The inner frame build went straight forward –…
Construction continues around engines cover – it is still separated from the model, will be fixed later. Then, following the…
If you’re Millennium Falcon fan then you know how StarWars movie models were created. Many detail parts on a surface…
Finally, I was able to test out Millennium Falcon motorized boarding ramp. Surprisingly it went fine without any adjustments!I was…
I sit for a moment to the model just to have a look on it…. and somehow 4h passed in…
Now time has come for some detailing work. Detail parts comes as plastic sprues that we used to in “ordinary”…
Again, DeAgostini did good job with mixing the construction between frame assembly, some exterior details and building motorized loading ramp.…
Issues from 19 to 29 completed. The construction went smooth basically focused on internal compartment and corridors. It looks like…
Stages 13 to 18 provides parts for internal compartment, corridor and bottom fuselage construction. As I am not planning (still)…
Punch it Chewie! Kit’s parts are organized in 100 construction steps (that means – a hundred of different sizes plastic…
The time has come to move-on and take to the workshop biggest model in my backlog.Deagostini Falcon Millennium in 1/43…